EMPOWERY & FARAPADID Reference lists
|
No.
|
Project Description
|
Project Name
|
Customer
|
Site location /Country
|
Voltage level
|
Year of Order
|
Type of contract/ (EPC)
|
Status
|
1
|
Engineering Services for electrical basic design
and Technical document preparation for HV equipment
|
Al Sader Power Plant Design
|
H.T.E.P Handelsgeselschaft
JLT (UAE)
|
Iraq
|
132
|
2012
|
E
|
Handed over
|
2
|
Installation, Testing, Commissioning + Supervision
and HV test
|
Al Sader PP 132 kV GIS
|
Haewa (Germany)/ Alstom (Switzerland)
|
Iraq
|
132
|
2013
|
C+S
|
Handed over
|
3
|
Algeria 8 x 66kV SS
Design and Engineering
|
Bayadh2, Boughezul 1&2&3 , Baten
, Laghuat, Zemmouri , El Hamel 2 SS Design
|
Seaway (Austria) /Metka
(Greece)
|
Algeria
|
66
|
2013
|
E
|
Handed over
|
4
|
Algeria 3 x 66 SS
Design and Engineering
|
AEH, Baraki, Hamma SS Design
|
Seaway (Austria) /Metka
(Greece)
|
Algeria
|
66
|
2013
|
E
|
Handed over
|
5
|
Algeria 400kV-220kV GIS SS
Design and Engineering
|
TOUGOURT SS Design
|
Seaway (Austria) /Metka
(Greece)
|
Algeria
|
400
|
2013
|
E
|
Handed over
|
6
|
132kV CVT Supply
|
Al Sader Power Plant CVT Supply
|
AYSEVEN Co. (Turkey)
|
Iraq
|
132
|
2013
|
P
|
Delivered
|
7
|
132 kV Porcelain Surge Arrester
|
Al Sader Power Plant SA Supply
|
AYSEVEN Co. (Turkey)
|
Iraq
|
132
|
2013
|
P
|
Delivered
|
8
|
Supply of Contact Wire Cu-Ag 120MM2 Round Copper
Wire
|
Mashhad OCS Supply
|
Mashhad Urban
|
Iran
|
-
|
2013/ 2014
|
P
|
Delivered
|
9
|
132 kV Post Insulator
|
Al Sader Power Plant PI Supply
|
AYSEVEN Co. (Turkey)
|
Iraq
|
132
|
2013
|
P
|
Delivered
|
10
|
30MVA Air Core Shunt Reactor
|
Al Sader SS Shunt Reactor Supply
|
AYSEVEN Co. (Turkey)
|
Iraq
|
132
|
2013
|
P
|
Delivered
|
11
|
30MVA Air Core Shunt Reactor
|
Dibis Power Plant Shunt Reactor Supply
|
Sunir
|
Iraq
|
132
|
2013
|
P
|
Delivered
|
12
|
ABB Control Equipment
|
Bandar Imam Petrochemical
|
BIPC
|
Iran
|
-
|
2013
|
P
|
Delivered
|
13
|
DC Rectifier Charger
|
Qom Monorail
|
Mapna Raili
|
Iran
|
0.11
|
2013
|
P
|
Delivered
|
14
|
Design and Supply of
Non-Magnetic Steel Structure/Supports and Earthing System
|
Alsadr Power Plant Steel Structure Supply
|
FARAB / Ameran Ofogh
|
Iraq
|
-
|
2013
|
EP
|
Delivered
|
15
|
DC Power System Supply
|
Bahar DC Supply
|
Bahar Building
|
Iran
|
0.11
|
2013
|
EP
|
Delivered
|
16
|
DC Charger System
of HVS 63/20 KV S/S
|
Tehran Metro Line 3 HVS SS
|
Mapna Raili
|
Iran
|
0.11
|
2013
|
EP
|
Delivered
|
17
|
LVAC/DC Aux panels & Chargers and Inverters for RS
& LPS Stations
|
Tehran Metro L3 Substation
and AC/DC Supply
|
Mapna Rail
|
Iran
|
0.4,0.11
|
2013
|
EP
|
Delivered
|
18
|
Partial Discharge System (PD)
|
Al Sader SS PD Supply
|
MOE (Ministry of Electricity)
|
Iraq
|
132
|
2014
|
P
|
Delivered
|
19
|
GIS HV TEST KIT
VFSR system
|
Al Sader SS HV Test Supply
|
MOE (Ministry of Electricity)
|
Iraq
|
132
|
2014
|
P
|
Delivered
|
20
|
Installation, Testing & Commissioning+ Supervision
of
Al Sader 400kV GIS Substation
|
Al Sader Power Plant 400 kV GIS
|
AYSEVEN Co. (Turkey)
|
Iraq
|
400
|
2014
|
C+ S
|
Handed Over
|
21
|
Cable Sealing End 132kV Supply
|
Al Sader SS CSE Supply
|
MOE (Ministry of Electricity)
|
Iraq
|
132
|
2014
|
P
|
Delivered
|
22
|
Laser Shaft Alignment System Supply
|
KAHAK Wind Power Plant
|
Mapna MD1
|
Iran
|
20
|
2014
|
P
|
Delivered
|
23
|
Installation, Test and Commissioning of L3 Power
Portion
|
Tehran Metro L3
|
Mapna Raili
|
Iran
|
20,0.75
|
2014
|
EPC
|
Finished
|
24
|
132 kV Post Insulator
Supply
|
Behbahan Power Plant PI Supply
|
Mapna
|
Iran
|
132
|
2015
|
P
|
Delivered
|
25
|
Transformer Silicagel Supply
|
BIPC Petrochemical
|
BIPC
|
Iran
|
-
|
2015
|
P
|
Delivered
|
26
|
Fajr GIS Spare Part
|
Fajr 132 kV GIS Spare Part Supply
|
Fajr Petrochemical
|
Iran
|
132
|
2016
|
P
|
Delivered
|
27
|
Installation of Power Electric System Supply
|
Tehran Metro Line1-Aftab Station
|
Notash/Farab
|
Iran
|
0.75
|
2016
|
C
|
Finished
|
28
|
Installation, Testing & Commissioning+ Supervision
of
DIBIS 400kV GIS Substation
|
DIBIS Power Plant
|
Sunir
|
Iraq
|
400
|
2016
|
C+ S
|
Under Execution
|
29
|
Civil Construction, Mechanical & Electrical
Utilities Installation, and Testing
|
Iran Mall- R2M
|
Paydar Pey Sazeh
|
Iran
|
-
|
2016
|
EPC
|
Handed Over
|
30
|
Installation of Balance of Shirvan Power Plant
|
Shirvan Combined Cycle Power Plant
|
Mapna MD1
|
Iran
|
20,0.75
|
2016
|
PC
|
Handed over
|
31
|
Installation of 400KV Substation
|
Parand Combined Cycle Power Plant Substation
|
Mapna MD1
|
Iran
|
400
|
2016
|
PC
|
Handed Over
|
32
|
Mashhad Power
System Installation
|
Mashhad-L2 Third Rail Installation
|
Petro Omran Mahd Saze
|
Iran
|
|
2016
|
C
|
Handed
over
|
33
|
Civil
Construction, Mechanical & Electrical Utilities Installation and
Testing
|
Iran Mall
PR1
|
Paydar Pey Sazeh
|
Iran
|
-
|
2016
|
EPC
|
Handed over
|
34
|
Design Installation Of 3*20/0.4kv
Distribution Substations
|
Iran Mall
Substations
|
Paydar Pey
Sazeh
|
Iran
|
20
|
2016
|
EPC
|
Under
Construction
|
35
|
Hormoz 230KV Interconnection between
Substation & Power Plant
|
Hormoz Power Plant Interconnection
|
GIC International GmbH/
Germany
|
Iran
|
230
|
2017
|
EPC
|
Handed Over
|
36
|
Purchase Contract for Transition Seal
Covering Taxi Way
|
Iran Mall- Expansion Join Supply
|
Alborz Tat
|
Iran
|
|
2017
|
EPC
|
Under Execution
|
37
|
Civil Construction, Mechanical &
Electrical Utilities Installation and Testing
|
Mashhad Mall
|
Paydar Pey Sazeh
|
Iran
|
|
2017
|
EPC
|
Handed over
|
38
|
Installation of Electric Power Supply
System
|
Tehran Metro Line 7
|
Notash/Farab
|
Iran
|
0.75
|
2017
|
C
|
Handed Over
|
39
|
Installation of 132 kV,2*70 MVAR
Harmonic Fitter System as well as Civil Work at AL Mahdi corporation
|
AL Mahdi Filter Installation
|
Maschinenfabrk Reinhausen GmbH (MR)/ Germany
|
Iran
|
132
|
2017
|
EPC
|
Handed over
|
40
|
Basic and detail design and
Engineering of Rohina Steel factory 400Kv s/s
|
Rohina SS Design
|
Rohina Steel Company
|
Iran
|
400
|
2017
|
E
|
Finished
|
41
|
Compensation System Test and
Commissioning of Azaran Iron Factory
|
Azaran Iron Test
|
Sencse/Maschinenfabrk Reinhausen GmbH (MR)/ Germany
|
Iran
|
-
|
2017
|
C
|
Handed Over
|
42
|
Engineering, Supply and Installation
of DCS and Communication System
|
Lamerd Combined Cycle Power Plant
|
Shanghaei Electric/China
|
Iran
|
400
|
2018
|
EPC
|
Under Construction
|
43
|
Mashhad Power System
Installation (Part 2)
|
Mashhad-L2 Third Rail Installation
|
Petro Omran Mahd Saze
|
Iran
|
|
2019
|
C
|
Handed over
|
44
|
Supply of Cable
Sealing Ends
|
Bid Boland 132 kV GIS Substation
|
SSCO.
|
Iran
|
132
|
2019
|
P
|
Delivered
|
45
|
Installation,
Testing & Commissioning+ of Bidboland 132 kv GIS substation
|
Bid Boland 132 kV GIS Substation
|
SSCO.
|
Iran
|
132
|
2019
|
C
|
Handed Over
|
46
|
Design and Supply of
Communication system
|
Khalij, Bandar Abas and Bandar Pohl
230 kV substations
|
SSCO.
|
Iran
|
230
|
2019
|
EPC
|
Under Execution
|
47
|
Supply of Cable
Sealing Ends
|
Sungun, 72.5 and 36 kV Cable Sealing
End supply
|
SSCO.
|
Iran
|
63
|
2019
|
S
|
Under Execution
|
48
|
Design, Supply,
Installation, Testing and Commissioning of BOP panels and DCS system
at Dibis Power Plant
|
Dibis Power Plant, BOP panels and
Power Plant DCS system
|
MOE
|
Iraq
|
12 and 0.4
|
2019
|
EPC
|
Under Execution
|
49
|
Installation,
Testing & Commissioning of Khalij 230/63 kv GIS substation
|
Khalij 230/63 kV GIS Substation
|
SSCO.
|
Iran
|
230, 63 kV
|
2020
|
C
|
Under Execution
|
|
|
|
|
|
|
|
|
|